by CMS Corporation | Mar 17, 2022
Design-Build Emergent Repairs for 6 STI Tanks Highlights Removed and replaced six 10,000-gal STI above-ground fuel tanks Site work performed at night to minimize impact to Base operations Project completed 6 weeks ahead of schedule CMS executed a $3.4M design-build...
by CMS Corporation | Mar 17, 2022
Flex Lab Facility Highlights Prime mechanical subcontractor for a $54M multidisciplinary research building University-wide compatible BAS HVAC modular control system “2018 Award of Excellence in Construction – Mechanical/Commercial” category, Associated Builders and...
by CMS Corporation | Mar 16, 2022
Design-Build Port Operations Waterfront Facility Highlights Certified LEED-NC Silver by USGBC Used durable, high-performance materials to withstand humid waterfront environment Foundation built on fifty-four 14-in-diameter by 65-ft-deep auger cast piles with installed...
by CMS Corporation | Mar 16, 2022
Design-Build Renovate Provisions on Demand (POD) Area, Bldg. 1080 Highlights Design-Build, multi-disciplined renovation Facility provides hot/cold and healthy food options for Airmen working on the flight line CMS renovated existing space within Bldg. 1060, located...
by CMS Corporation | Mar 16, 2022
Emergency Repair of PARC Seawall Highlights Replaced 700 LF seawall to protect 1,000-year-old petroglyphs (figures carved in sandstone) Unique site required historical, archaeological and cultural expertise CMS demolished and replaced 700 LF of the existing seawall...