by CMS Corporation | Mar 29, 2022
McNutt Quadrangle North Residence Hall Renovation Highlights Fast-tracked mechanical upgrades to the largest dormitory complex at IU Bloomington Demolition and installation of new hot and chilled water systems New air distribution system for improved air quality and...
by CMS Corporation | Mar 29, 2022
Kittyhawk Dormitories Highlights Total of 180,000 SF of work Replaced windows & doors with blast-resistant windows & doors Self-performed blast-resistant window fabrication CMS executed an $11.6M Design-Bid-Build project at Wright-Patterson AFB to make repairs...
by CMS Corporation | Mar 22, 2022
Repair Hydrant Tanks 1-2 and 2-1 Highlights Design-Build project Repair of two 420,000-gallon JP-8 tanks at OCONUS DoD installation Mechanical, coating, and commissioning work CMS repaired two out-of-service 420,000-gallon above-ground JP-8 fuel tanks. Work included...
by CMS Corporation | Mar 22, 2022
Repair Tank A19 Highlights Repair and recoating of JP-8 cut-and-cover fuel tank holding 100,479 BBL – the equivalent of over 4.2M gallons Lead-based paint and hexavalent chromium abatement Logistically challenging OCONUS project CMS repaired and recoated a 100,479-BBL...
by CMS Corporation | Mar 22, 2022
Design-Build HVAC and A/C Upgrades and Repairs, Various Historical Buildings Highlights Work located in the designated Pearl Harbor Historic District D-B renovation of over 137,000 SF in 6 buildings, including multi-story occupied structures Received Award of...