by CMS Corporation | Mar 17, 2022
D-B Recapitalize Deep Draft Berthing Wharf Charlie C-2 Highlights Placed 4,135 tons of piles, including 124 king piles (92’ long, 51,000 lbs each) and 282 sheet piles (64’ long, 6,900 lbs each) Extensive dewatering of excavations 10’ to 20’ below sea level Two...
by CMS Corporation | Mar 17, 2022
Design-Build Replacement of Tank 34 and Vehicle Fueling Station Highlights Design-Build project Design incorporated considerations for high winds/hurricanes, local seismic conditions, and corrosive ocean environment Field-fabricated an API 653 tank per UFC 03-460-01,...
by CMS Corporation | Mar 17, 2022
Design-Build Emergent Repairs for 6 STI Tanks Highlights Removed and replaced six 10,000-gal STI above-ground fuel tanks Site work performed at night to minimize impact to Base operations Project completed 6 weeks ahead of schedule CMS executed a $3.4M design-build...
by CMS Corporation | Mar 17, 2022
Flex Lab Facility Highlights Prime mechanical subcontractor for a $54M multidisciplinary research building University-wide compatible BAS HVAC modular control system “2018 Award of Excellence in Construction – Mechanical/Commercial” category, Associated Builders and...
by CMS Corporation | Mar 16, 2022
Design-Build Port Operations Waterfront Facility Highlights Certified LEED-NC Silver by USGBC Used durable, high-performance materials to withstand humid waterfront environment Foundation built on fifty-four 14-in-diameter by 65-ft-deep auger cast piles with installed...