by CMS Corporation | Mar 22, 2022
Design and Repairs for Various DLA-E Fuels Facilities Highlights OCONUS design-build fuels project Work coordinated between two locations, two hours apart Completed over 2 months ahead of schedule CMS provided design and repairs for various DLA-E fuels facilities at...
by CMS Corporation | Mar 22, 2022
Fuel Hydrant System Pipeline Expansion Highlights Installed over 24,000 feet of 12- and 16-inch epoxy-lined and FBE-coated pipe Used domestically-made steel pipe and specialty underground structures, domestic material suppliers, and locally-sourced labor Part of a...
by CMS Corporation | Mar 17, 2022
Design and Construct a Temporary Modular Facility, Hospital Swing Space Highlights Design-Build project 26,000 SF swing space complex CMS designed and constructed a temporary 26,000 SF swing space complex to house Wright-Patterson AFB hospital personnel and operations...
by CMS Corporation | Mar 17, 2022
Repair High Temperature Hot Water (HTHW) & Steam Line D Highlights Removed and replaced HTHW lines and high-pressure steam (HPS) lines Work complied with High Performance and Sustainable Building (HPSB) requirements Work required a detailed Traffic Control Plan...
by CMS Corporation | Mar 17, 2022
Design-Build Convert F/20006 to Program Executive Office (PEO) Highlights Designed and constructed a unique “building within a building” A New facility built inside the hangar did not touch the hangar exterior – maintaining the historical integrity of the WWII-era...