laying asphalt on Cape Canaveral tarmac

Construction Services for Hangars J and K and TSF Paving

Location: Cape Canaveral Air Force Station, FL

Client: US Air Force

Value: $3.2M

Highlights

  • Design-Build (D-B) project
  • Milling/Repaving of 426,232 SF (47,359 SY) of hot mix asphalt (HMA) hangar access and parking pavement
  • D-B 1,100 SF pre-engineered metal building (PEMB)

CMS completed this design-build project to mill and replace over 426,200 SF of HMA in the compound areas of Hangars J and K, the area outside to the main road, and a portion of the Technical Support Facility (TSF) parking area.

New construction included installing a 1.5” potable water supply from Hangar J to the General Maintenance Building and replacing two sanitary sewer lines from Hangar J to the sewer manholes. The crew also relocated existing conduit and installed new 2.5” PVC communication conduit, repaired sidewalks, improved site drainage, installed trailer tie-down anchors, restriped pavement, and built a 1,100 SF PEMB (the Barrel Storage Building).