by CMS Corporation | Nov 13, 2024
Construct Bulk Storage Tanks, Phase 1, Marine Corps Air Station (MCAS) Iwakuni, Japan Highlights Tank demolition Installation of new 72,000-BBL (3,024,000 gallons) tank CMS is demolishing three existing 10,000-barrel (BBL or 420,000 gallons) aboveground fuel storage...
by CMS Corporation | Nov 13, 2024
Repair Hydrant Tanks, Kadena AB, Japan Highlights Hydrant fueling control system Modernization of R-12 HHT checkout stand CMS is modernizing and repairing the hydrant fueling control system at this location. We will repair flow controls and pressure relief systems, as...
by CMS Corporation | Nov 12, 2024
Various Piping Repairs, Misawa AB, Japan Highlights Selective demolition Above- and below-ground piping This project involves comprehensive repairs involving above- and below-ground piping and associated equipment at several critical facilities. Specifically, the...
by CMS Corporation | Nov 12, 2024
Various Fuel System Repairs at Tank Farm 2 Highlights Electrical repairs Tank component repairs CMS is repairing electrical components and replacing vertical filter separators at Tank Farm 2, a truck offload facility, at Misawa AB. In addition, we are repairing Tank...
by CMS Corporation | Nov 12, 2024
Various Fuel System Repairs Highlights Multiple tank locations Type III and IV hydrant systems CMS is making repairs at Misawa AB Tank Farms 1 and 2, a truck offload facility, Type III and IV hydrant systems, and the North and South Service Stations. Work includes...